Civil engineering construction components needed for an elevator operation are given below:
- A lift well of suitable size. It is usually extending up to 1600–2000 mm below the bottom landing.
- At every floor level for entry of people an opening of height of 2 m is to be provided.
- An upper machine room on the top of the lift to suit the lift size is chosen.
Leave a Reply