Following preventive measures and repairs may be undertaken to prevent leakage.
- During construction stage itself, flat concrete roofs are to be cured perfectly. Any leakage noticed at this stage can be rectified easily. All surfaces can be given a coat of hot blown asphalt after curing.
- Adequate slope may be given to the drain pipe joints such that stagnation of water is prevented.
- Wherever the horizontal surfaces meet the vertical or inclined faces, fillets are to be provided. The gap formed with time has to be closed periodically.
- All the entry points of the rain water should be checked and should not be blocked by leaves, wastes, etc.
- Weathering courses, like flat tiles, laid on the roof should not crack. If cracks are found they should be closed immediate by grouting or otherwise.
- Very porous concrete slabs may have to be grouted.