Common Project Change Control Challenges

Managing project changes, let’s look at the challenges faced by many project managers. Here’s a list of things to either avoid or be on the lookout for:

  • The obvious—Be sure to set up a change control system as part of your approved project plan—and then use it.
  • Can’t say “no”—Use your change control system and don’t automatically agree to accept a scope change request without running it through the process. This is a common issue with project managers who have a fear of confrontation. Use your system as an objective third party to minimize direct confrontations.
  • Can’t say “yes”—Some project managers take the other extreme. They are so paranoid about scope creep that they do not listen to consider legitimate scope changes, often overlooking changes that are needed to meet the project objective. Again, keep the focus on the big picture (the project objectives) and exercise your change control system.
  • Overreliance on formal sign-offs—Formal sign-offs are important and valuable; however, they should represent genuine agreement and understanding. Verify that you have real understanding and buy-in before proceeding.
  • Not the “gold” you want—Be on the lookout for gold-plating, the term given to extras or features added to the work product by the project team but not requested by the customer. This is a common reason why schedule delays occur and why unnecessary risks occur on projects. Also, the same issue can manifest itself in a work process. A technician might want their work to be perfect rather than just meet the specifications for the project. This is another reason why a team approach to estimating and planning can be so valuable.
  • Is it really a change?—Not that this ever happens, but sometimes stakeholders do not agree on what really is an official change. I know—it’s hard to believe. Especially in contractual arrangements, the issue isn’t always “Is it a change?” but rather “Do I have to pay for it?”—a slightly different matter. There are no silver bullets here. Most of the disagreements occur because of ambiguity or inconsistencies in the specifications. Just do the other things previously mentioned, and you should have a solid foundation to deal with this, if it ever happens.
  • The impact of the change—In most cases, the individuals who need to assess the impact of a proposed change, especially scope changes, are members of the existing project team—who have current work assignments. Be aware of the impact that this unplanned effort could have on the project, and guide the CCB accordingly.
  • Inadequate impact analysis—You are exercising your change control system. The change request is being assessed. You are in good shape—right? Probably. Just make sure the analysis performed on the impact is complete. At the minimum, verify the following on any change request assessment:
    • Has the total work effort been accounted for? All supporting processes? All impacted deliverables?
    • Have the implications of the request been completely considered?
    • Have all impacted stakeholders been considered?
  • Beware of the little guys—On most projects, there will always be one or more of those small, minor scope changes. Sometimes they are clear changes; other times, they fall into a gray area. In an effort to build relationships and please the customer, many project managers do not document these if they feel the change requires minimal effort to implement. Be very careful here. Before you know it, you can easily have a series of these little changes that, when added up, can affect your project. In addition, you must manage the expectations you are setting if you overuse this technique. As a rule, I would encourage you to at least document every change—no matter how small. For small ones, you might choose to group them into a single change request.

The Absolute Minimum

At this point, you should have a solid understanding of the following:

  • The ability to manage and control the change elements on a project, particularly the project scope, is a key to project success and a key performance indicator for a project manager.
  • A project change is a change in any of the critical success factors (scope, schedule, costs, quality, and project acceptance criteria).
  • The seven key management principles for effective project change control are the following:
    1. Expect and plan for changes.
    2. Set up a change control system.
    3. Educate stakeholders on process.
    4. Use the system.
    5. Work to minimize scope changes.
    6. Ensure that all changes are communicated and understood.
    7. Be alert to anything that could impact the critical success factors.
  • The chief causes of unplanned scope changes include shifts in business drivers, project acceptance criteria, and technology, and inadequate scope statements and requirements definition.
  • Completion criteria should be captured for any scope-related change request.
  • Agile projects still need proper change control, especially for any requested changes that impact the baseline budget and/or schedule.
  • Powerful techniques for minimizing project changes include a clear project definition, a solid requirements definition, effective traceability of requirements, getting formal acceptance sign-offs, implementing the right project approach, and assembling a team of engaged stakeholders.

The map in Figure 11.2.

An overview of managing project changes.