Category: Basic Industrial Engineering
-
Hazardous Waste Landfill (Sequestering, Isolation, etc.)
Hazardous waste may be sequestered in a hazardous waste landfill or permanent disposal facility. “In terms of hazardous waste, a landfill is defined as a disposal facility or part of a facility where hazardous waste is placed or on land and which is not a pile, a land treatment facility, a surface impoundment, an underground…
-
TSDFs Permits
TSDFs manage hazardous waste under RCRA Subtitle C and generally must have a permit in order to operate. While most facilities have RCRA permits, some continue to operate under what is called “interim status.” Interim status requirements appear in 40 CFR Part 265 (USEPA 2012). The permitting requirements for TSDFs appear in 40 CFR Parts 264…
-
Few RCRA Provisions: Cradle–to‐Grave Requirements
The EPA’s cradle‐to‐grave hazardous waste management system is an attempt to track hazardous waste from its generation point (the “cradle”) to its ultimate disposal point (the “grave”) (Figure 4.16). Arguably, the most notable provisions of the RCRA statute are included in Subtitle C, which directs EPA to establish controls on the management of hazardous wastes…
-
Resource Conservation and Recovery Act
The RCRA, enacted in 1976, is the principal federal law in the United States governing the disposal of solid waste and hazardous waste (RCRA 1976). History and Goals Congress enacted RCRA to address the increasing problems the nation faced from its growing volume of municipal and industrial waste. RCRA amended the Solid Waste Disposal Act of…
-
Industrial Solid Wastes and Its Management
Solid Waste Treatment: Some Perspectives on Recycling In 2010, Americans generated about 250 million T of municipal solid waste (MSW) (before recycling), an about 8% increase over 2000, an increase of 17% over 1990, and 36% over 1980 (USEPA 2002a, 2014). Thus, management of MSW continues to be an important challenge facing the United States and other highly…
-
Continuous Emission Monitoring
An alternative to performing one‐time measurement is to perform continuous measurement of the contaminant using a CEM (also referred to as CEM system). A CEM has many of the same attributes as a stack test (Sections 4.19.8 and 4.19.9). A probe is inserted in the stack and the sample is conditioned appropriately before it enters an analyzer…
-
CAA Enforcement Provisions
There are several enforcement options that EPA can take under the CAA. These include the following: Each of these is discussed below. Individual states may have similar provisions for violation of state statutes and will have provisions at least as stringent as these for violation of state statutes that are delegation of federal statutes. CIVIL…
-
Monitoring
Monitoring can include everything from continuous emission monitoring (CEM) to keeping records of complaints received. Monitoring can be quite expensive. Even if the equipment used for monitoring is not expensive, there is always a frequency of monitoring that must be met, and doing the monitoring takes staff resources that, for a large facility, can be…
-
Compliance
Compliance Requirements Once a source has received an air quality permit, it is important to stay in compliance with all of the permit conditions included. The federal PSD permitting process and Title V program require that each PSD permit, Title V permit specifies the regulations applicable to the permitted source. Furthermore, the PSD permit also…
-
State Implementation Plan
The CAA requires states to develop individualized SIP that outlines how they plan to achieve the NAAQS. The SIP is a collection of regulations and documents used by a state, territory, or local air district to reduce air pollution in areas that do not meet the NAAQS. What National Standards must SIPs Meet? EPA has…