Category: Integration Plan And Test Strategy
-
Developmental/Unit Test and Integration
During the Developmental/Unit Test and Integration phase, engineering components are physically integrated into successively larger aggregates of hardware and software. Tests are developed and conducted to assure that the functions defined by the preliminary and detailed designs are being accomplished, including performance requirements, error detection and recovery, and degraded operations. Inputs Process The engineering organizations…
-
Introduction
The presents an example of an Integration Plan and Test Strategy based on a real-world aircraft development program. The various phases of test and integration are described, with inputs, process description, outputs, and milestone reviews provided for each phase discussed. Systems engineering works jointly with the Integrated Project Teams (IPTs) responsible, to assure that all…