Category: Preventive Measures and Maintenance of Buildings
-
Terrazzo Floors
Cleaning of terrazzo floors with water may be taken up after 3 months of laying. After this period, it should be swabbed daily using clean water and a clean rough swab (floor cloth) which should be rinsed in water frequently so as to avoid dirt being back on to the floor. The floor is then…
-
MAINTENANCE OF FLOORINGS
As there are many types of floors constructed, maintenance of some of the important floors are dealt below.
-
INTRODUCTION
Primarily it is needed to take preventive measures wherever feasible before facing any failure in small or large scale. A small investment or preventive measure taken at the initial stage not only prevents failure but also gives a long life of the building. Then maintenance plays a major role to make every component of a…