Author: haroonkhan

  • Porosity

    All of petroleum engineering deals with the exploitation of fluids residing within porous media. Porosity, simply defined as the ratio of the pore volume, Vp, to the bulk volume, Vb, is an indicator of the amount of fluid in place. Porosity values vary from over 0.3 to less than 0.1. The porosity of the reservoir can be…

  • Components of the Petroleum Production System

    Volume and Phase of Reservoir Hydrocarbons Reservoir The reservoir consists of one or several interconnected geological flow units. While the shape of a well and converging flow have created in the past the notion of radial flow configuration, modern techniques such as 3-D seismic and new logging and well testing measurements allow for a more…

  • Introduction

    Petroleum production involves two distinct but intimately connected general systems: the reservoir, which is a porous medium with unique storage and flow characteristics; and the artificial structures, which include the well, bottomhole, and wellhead assemblies, as well as the surface gathering, separation, and storage facilities. Production engineering is that part of petroleum engineering that attempts…

  • The History Match

    The reservoir model developed in the previous two sections will now be applied to history-matching production data from a well in a volumetric, internal gas-drive reservoir. Actual oil production and instantaneous gas-oil ratios for the first 3 years of the life of the well are plotted in Fig. 12.1. The data for the problem were obtained…

  • Incorporating a Flow Equation into the Model

    The procedure mentioned in the previous section yields oil and gas production as a function of the average reservoir pressure, but it does not give any indication of the time required to produce the oil and gas. To calculate the time and rate at which the oil and gas are produced, a flow equation is…

  • History Matching with the Zero-Dimensional Schilthuis Material Balance Equation

    Development of the Model The equations do not have a time dimension associated with them. These equations simply relate average reservoir pressure to cumulative production. To obtain rate information, a method is needed whereby time can be related to either the average reservoir pressure or cumulative production. Single-phase flow in porous media was discussed and…

  • History Matching with Decline-Curve Analysis

    Decline-curve analysis is a fairly straightforward method of predicting the future production of a well, using only the production history of that well. This type of analysis has a long tradition in the oil industry and remains one of the most common tools for forecasting oil and gas production.8–13 In general, there are two approaches to…

  • Introduction

    One of the most important job functions of the reservoir engineer is the prediction of future production rates from a given reservoir or specific well. Over the years, engineers have developed several methods to accomplish this task. The methods range from simple decline-curve analysis techniques to sophisticated multidimensional, multiflow reservoir simulators.1–7 Whether a simple or complex…

  • Screening Criteria

    Table 11.2 contains the screening criteria that have been compiled from the literature for the miscible, chemical, and thermal techniques. Table 11.2 Screening Criteria for Tertiary Oil Recovery Processes The miscible process requirements are characterized by a low-viscosity crude oil and a thin reservoir. A low-viscosity oil will usually contain enough of the intermediate-range components for the…

  • Screening Criteria for Tertiary Processes

    A large number of variables are associated with a given oil reservoir—for instance, pressure and temperature, crude oil type and viscosity, and the nature of the rock matrix and connate water. Because of these variables, not every type of tertiary process can be applied to every reservoir. An initial screening procedure would quickly eliminate some…