Each job or unit of construction has to be further planned with respect to the following:
1. Manner of Execution of the Job
The jobs may be executed departmentally or through contractor. In case the work is done through the contractor, type of contract is to be finalised.
2. Duration of the Job
The factors which contribute for the duration of job or the proposed period of its completion are:
- Urgency of the work
- Availability of resources
- Position of the construction with reference to network
3. Planning of Resources
Resources of a construction project comprises of the following:
- Plant, equipment and machinery
- Construction stores
- Both technical and non-technical staff and skilled and unskilled labour
- Construction Material